Every rule your project must meet, found for you.
Search Northern Ireland’s planning and building-control guidance, ask a question in plain English, or generate a project compliance checklist — every answer cited to the source.
Working to a specific project? Generate a compliance checklist →
Answers, with citations
Ask in plain English and get an answer that links to the exact source clause — never an unsourced guess.
Scoped to your council
Overlay a council's local development plan on the Northern Ireland-wide regulations and policy.
Project compliance checklist
Characterise a project and get the requirements that apply, grouped by work area. Try it →
The library
Search the source guidance
3 results · filtered
Table of Contents - Section 8 Condensation
Section 8NI-wide·Technical Booklet C Site Preparation and Resistance to Contaminants and Moisture
Section 8 Condensation 38 Interstitial condensation 38
condensationventilationInsulated external walls - examples
Diagram 6.4NI-wide·Technical Booklet C Site Preparation and Resistance to Contaminants and Moisture
Solid walls: external protective system with 50 mm minimum residual cavity, breather membrane, sheathing board, vented and drained cavity. Cavity walls: (a) External insulation, (b) Internal insulatio
dwellingnon-domesticinsulationexternal-wallsmoisturecondensationInterstitial condensation - scope
8.1, 8.2NI-wide·Technical Booklet C Site Preparation and Resistance to Contaminants and Moisture
Regulation 29 (Condensation) applies only to dwellings. A dwelling should meet the requirement to avoid any harmful effects caused by interstitial condensation if it is designed and constructed in acc
dwellingcondensationmoisture