Technical Booklet M Physical Infrastructure for High Speed Communications Networks·Page 12·2.1

Regulation 77B Requirements for High-Speed Ready In-Building Physical Infrastructure

High-speed-ready in-building physical infrastructure must be provided from the access point to network termination points. Network cabling, equipment, or infrastructure extending beyond termination points, or external infrastructure beyond the access point, are not required.

Regulation 77B(1) requires high-speed-ready in-building physical infrastructure from the access point, at which service providers gain access to the infrastructure, up to the network termination points at which connections to a public communications network can be made in the future. It is not a requirement to provide any network cabling or equipment, or any in-building infrastructure that extends internally beyond the network termination point. Nor is it a requirement to provide any external or site-wide infrastructure beyond the access point.

Source — /Users/richardhill/Documents/planning-arch-project/data/documents/regional/Technical Booklet M - Physical Infrastructure for High-Speed Communications Networks.pdf