Technical Booklet M Physical Infrastructure for High Speed Communications Networks·Page 11·1.5

Multi-dwelling Buildings and Common Access Points

Multi-dwelling buildings with two or more flats must comply with regulation 77B(2) requirements and should provide a common access point for high-speed broadband infrastructure.

Where a multi-dwelling building contains two or more flats, each of the flats should be regarded as a part of the multi-dwelling building and hence the building should comply with the requirement of regulation 77B(2). A common access point should be provided.

Source — /Users/richardhill/Documents/planning-arch-project/data/documents/regional/Technical Booklet M - Physical Infrastructure for High-Speed Communications Networks.pdf