Technical Booklet G Resistance to the Passage of Sound·Page 74·3.53
Separating wall type 3.3 – floor base and cavity requirements
The floor base (excluding any screed) should be carried through to the cavity face of the leaf of the core, and the cavity should not be bridged.
The floor base (excluding any screed) should be carried through to the cavity face of the leaf of the core. The cavity should not be bridged.
Source — /Users/richardhill/Documents/planning-arch-project/data/documents/regional/Technical Booklet G - Resistance to the Passage of Sound.pdf