PPS 15 Planning and Flood Risk (Revised)·Page 79·E8

Flood Resilience - Pipes and Services

Electrical wiring should be dropped from first floor or roof level, with all fuse boxes and electrical sockets kept at least 1.5m height to prevent flood damage.

Recommended methods are:- Pipes and Services Electrical wiring can be dropped down from the first floor / roof level and by ensuring that all fuse boxes and electrical sockets are kept at least 1.5m

Source — /Users/richardhill/Documents/planning-arch-project/data/documents/regional/PPS 15 - Planning and Flood Risk (Revised).pdf