PPS 15 Planning and Flood Risk (Revised)ยทPage 72
Emergency Preparedness Requirements
Development proposals must include emergency evacuation plans, procedures for moving goods to safe locations, safe electrical shutdown, and pollution control measures.
Emergency evacuation plans and procedures including safe access and egress for emergency rescue services; Capacity and procedures for the rapid movement of furniture and goods to locations outwith of the flood risk area; Safe shutdown of electrical supply for domestic and industrial use; Pollution control procedures.
Source โ /Users/richardhill/Documents/planning-arch-project/data/documents/regional/PPS 15 - Planning and Flood Risk (Revised).pdf