PPS 15 Planning and Flood Risk (Revised)·Page 46·Policy FLD 5

Replacement Buildings Near Reservoirs

Replacement of existing buildings within potential flood inundation areas downstream of controlled reservoirs requires a Flood Risk Assessment demonstrating no net increase in flood risk.

A proposal for the replacement of an existing building within the potential flood inundation area downstream of a controlled reservoir must be accompanied by a Flood Risk Assessment. Planning permission will be granted provided it is demonstrated that there is no

Source — /Users/richardhill/Documents/planning-arch-project/data/documents/regional/PPS 15 - Planning and Flood Risk (Revised).pdf