Every rule your project must meet, found for you.
Search Northern Ireland’s planning and building-control guidance, ask a question in plain English, or generate a project compliance checklist — every answer cited to the source.
Working to a specific project? Generate a compliance checklist →
Answers, with citations
Ask in plain English and get an answer that links to the exact source clause — never an unsourced guess.
Scoped to your council
Overlay a council's local development plan on the Northern Ireland-wide regulations and policy.
Project compliance checklist
Characterise a project and get the requirements that apply, grouped by work area. Try it →
The library
Search the source guidance
3 results · filtered
Flood Risk Planning Policy
NI-wide·Technical Booklet C Site Preparation and Resistance to Contaminants and Moisture
Planning (Northern Ireland) Order 1991 Development in areas of flood risk is regulated by the Northern Ireland Planning Service under the Planning (Northern Ireland) Order 1991. The planning policy in
flood-risksite-planningFlood Risk Material Consideration
NI-wide·Technical Booklet C Site Preparation and Resistance to Contaminants and Moisture
Flood risk The susceptibility of land to flooding is a material consideration which is taken into account by the Northern Ireland Planning Service in determining planning applications. There is a pres
flood-risksite-planningBuilding Regulations and Flood Risk Mitigation
NI-wide·Technical Booklet C Site Preparation and Resistance to Contaminants and Moisture
The Building Regulations do not set any requirements for resistance to flooding. However, where planning permission is granted for a building in an area considered to be at risk of flooding, or where
flood-riskdrainagemoisture-resistance