Every rule your project must meet, found for you.
Search Northern Ireland’s planning and building-control guidance, ask a question in plain English, or generate a project compliance checklist — every answer cited to the source.
Working to a specific project? Generate a compliance checklist →
Answers, with citations
Ask in plain English and get an answer that links to the exact source clause — never an unsourced guess.
Scoped to your council
Overlay a council's local development plan on the Northern Ireland-wide regulations and policy.
Project compliance checklist
Characterise a project and get the requirements that apply, grouped by work area. Try it →
The library
Search the source guidance
3 results · filtered
Development plan zoning and flood risk avoidance
4.4NI-wide·PPS 15 Planning and Flood Risk (Revised)
Development plans need to take account of the potential risks from all sources of flooding over the plan period and beyond as this is likely to influence decisions on such matters as the zoning of lan
site-planningflood-riskresidentialeconomic-developmentWatercourse integration in residential development
6.52NI-wide·PPS 15 Planning and Flood Risk (Revised)
Consistent with the requirements of PPS 7 'Quality Residential Environments'; incorporating watercourses into the open space requirements for new residential development will be preferred to locating
dwellingresidentialflood-riskexternal-spaceEconomic Benefits of Sustainable Drainage
C11NI-wide·PPS 15 Planning and Flood Risk (Revised)
Economic benefits likely to accrue from sustainable drainage include the following: The increased application of on-site sustainable drainage solutions by the developer will mean that less investment
drainagesite-planningdwellingresidential