Every rule your project must meet, found for you.
Search Northern Ireland’s planning and building-control guidance, ask a question in plain English, or generate a project compliance checklist — every answer cited to the source.
Working to a specific project? Generate a compliance checklist →
Answers, with citations
Ask in plain English and get an answer that links to the exact source clause — never an unsourced guess.
Scoped to your council
Overlay a council's local development plan on the Northern Ireland-wide regulations and policy.
Project compliance checklist
Characterise a project and get the requirements that apply, grouped by work area. Try it →
The library
Search the source guidance
2 results · filtered
Safety and access considerations for surface water SuDS
NI-wide·PPS 15 Planning and Flood Risk (Revised)
Safety and access considerations associated with surface water will always need to be considered as part of the overall design of the development in general and surface water SuDS features in particul
drainageaccesssite-planningRaised floor levels
E6NI-wide·PPS 15 Planning and Flood Risk (Revised)
Finished floor levels of the building are designed to be above the design flood level. The levels will also include an additional height to accommodate a suitable freeboard. Driveways, paths and entra
flood-risksite-planningaccess